VSS School

Location
Vernon, BC
Architect
MQN
SECTOR
Public
BUILDER
Yellowridge Construction Ltd.
Imagery
MQN
YEAR
2013
Vernon Secondary School is a 950-student capacity facility designed to meet LEED® Gold standards. The building is primarily steel construction, featuring long-span open web steel joists in the gymnasium to support flexible, open spaces for athletics and assemblies. A faceted glazed façade enhances natural light while integrating seamlessly with the structural systems.
MORE DETAILS
CLIENT
School District No. 22
SUB-SECTOR
Education, Recreation
SIZE
184500 sf
BUDGET
$30M
Our Team
No items found.
TAGS
Steel
Concrete
Mass Timber
LEED



Selected Work
VIEW ALL








_f_edit.avif)








